Where cut-yield, cold-chain, SKU mix, and cents-per-kilo margins all meet.

Meat and poultry processing runs hundreds of cuts, packs, and customer specs through a few cut-floors and packing lines, against a cold-chain clock that punishes every wasted minute. Margins are measured in cents per kilo. The combinatorial space of cut plans + line sequencing + cold-chain windows is too large for spreadsheets and too dynamic for off-the-shelf APS. KPT mathematically models cut-yield, line balance, and freshness windows together — and integrates with your existing SAP / MES setup without customization.

Pipeline prospect Target sector — Brazilian meat-processing leaders (JBS, BRF, Marfrig).

How KPT helps

A decision-support layer for meat & poultry planners.

Meat and poultry processing combines biological variability with a discrete-batch operation: each carcass yields a stochastic mix of primal cuts, hundreds of finished SKUs compete for the same downstream lines, and the cold-chain clock keeps ticking. KPT's optimizer attacks the planning surface from three directions at once:

  • Cut-plan the day to maximize value-per-kilo across the actual cut yields, not the textbook ones.
  • Sequence packing lines to fit cold-chain windows and minimize SKU changeover.
  • Surface the OEE and yield losses worth recovering, ranked by dollars per kilo.

All recommendations flow through a planner-approval UI. No write-back to SAP / MES happens without explicit human sign-off. Shadow-run trust gates A/B-test every variable for 30 days before promotion — the same glass-box discipline that runs at the PVM reference deployment.

Specific outcomes KPT delivers

  • Cut-Yield + Mix Optimization

    Lift value-per-kilo by reallocating cuts to higher-margin SKUs the planner would miss.

  • Cold-Chain-Aware Scheduling

    Sequence packing windows to keep freshness margins intact across the day.

  • Vibration-Anomaly Predictor

    Flag bearing and motor degradation 7–14 days before unplanned line failures.

  • Probabilistic Demand Forecaster

    P10 / P50 / P90 demand quantiles per SKU per region feed cut-planning directly.

Where to start

A 2-week PoC on a single cut-floor + the packing lines downstream of it, with full read-only deployment and a planner-approved-only write path. Atlas leads — cut-plan + line sequencing is the highest-leverage entry point.

Meat & Poultry PoC

2 weeks to a live PoC.

One cut-floor. One measurable KPI — value-per-kilo, yield, or on-time-shipment. A 2-week assessment, a shadow-run validation, and measured impact in dollars. The same playbook that proved out at PVM, retargeted to the protein floor.